Sample Power Group: Long-term FGD Sorbent Supply for 2×660 MW Units

客户案例
Customer:
Sample Power Group
Industry:
Power FGD
Sample Power Group: Long-term FGD Sorbent Supply for 2×660 MW Units

(Sample content – replace with real information in the console.)

Background

The customer used ordinary hydrated lime with unstable removal efficiency.

Solution

  • High-surface-area Ca(OH)₂ (≥ 18 m²/g)
  • Tanker delivery with dual silos
  • COA for every batch

Result (sample data)

Sorbent consumption reduced by about 15%.

Get the latest price & free samples

Get a Quote